Great-plains DICKEY-john AI100 10-inch Virtual Terminal Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Matériel Great-plains DICKEY-john AI100 10-inch Virtual Terminal. Great Plains DICKEY-john AI100 10-inch Virtual Terminal User Manual [en] Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 73
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
10" Virtual Terminal
11001-1440-200701
i
TABLE OF CONTENTS
10” Virtual Terminal (VT) ..................................................................................... 1
Virtual Terminal/Display..................................................................................................... 1
VT Installation ...................................................................................................... 3
Mounting Bracket Features................................................................................................ 3
Cab Harness Connections ................................................................................................. 4
VT Cab Harness Connections........................................................................................................... 5
VT Display............................................................................................................. 7
Power................................................................................................................................. 7
Navigation.......................................................................................................................... 7
Data Entry.......................................................................................................................... 7
Touch Screen Data Entry.................................................................................................................. 8
Rotary Knob Data Entry (Numbers) .................................................................................................. 9
Editing Individual Text String Characters .......................................................................................... 9
Check Boxes ................................................................................................................................... 10
List Selection................................................................................................................................... 11
VT Setup/Configuration Mode ......................................................................................... 12
Information....................................................................................................................... 12
Regional and Unit Settings .............................................................................................. 12
Display/Volume Setup and Screen Calibration ................................................................ 14
Auxiliary Assignment ....................................................................................................... 15
Date and Time Setup ....................................................................................................... 17
Additional Applications..................................................................................................... 18
Application Definitions ..................................................................................................... 18
Task Controller................................................................................................................................ 18
Global Positioning System .............................................................................................................. 18
CAN Bus Logger ............................................................................................................................. 19
Stored Object Pools ........................................................................................................................ 19
Tractor ECU ........................................................................................................ 21
Upper Work Screen......................................................................................................................... 21
Lower Work Screen......................................................................................................................... 21
TECU Setup..................................................................................................................... 23
Work Mode ...................................................................................................................... 23
I/O Sensor Configuration ................................................................................................. 24
Ground Speed Calibration ............................................................................................... 25
Maximum and Minimum Ground Speed Limits ............................................................................... 26
Wheel Slip Limits............................................................................................................................. 26
PTO Configuration ........................................................................................................... 27
Three-Point Hitch Configuration ...................................................................................... 28
Accumulators ................................................................................................................... 30
Activating Accumulators.................................................................................................................. 30
Clearing Accumulators .................................................................................................................... 30
Lifetime Accumulator....................................................................................................................... 31
Alarms.............................................................................................................................. 32
Audio ............................................................................................................................................... 32
Full Screen Alarms.......................................................................................................................... 33
Service............................................................................................................................. 34
Vue de la page 0
1 2 3 4 5 6 ... 72 73

Résumé du contenu

Page 1 - TABLE OF CONTENTS

10" Virtual Terminal11001-1440-200701iTABLE OF CONTENTS 10” Virtual Terminal (VT) ...

Page 2

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-2007018 / VT DISPLAYFigure 4Yellow Box ExampleTOUCH SCREEN DATA ENTRYNOTE: When editing a data it

Page 3 - 10” VIRTUAL TERMINAL (VT)

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701VT DISPLAY / 9Figure 6Keypad DefinitionsROTARY KNOB DATA ENTRY (NUMBERS)Screen Data Entry

Page 4

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070110 / VT DISPLAYFigure 7Touch Screen KeypadUsing the Rotary Knob:Text strings can be customi

Page 5 - VT INSTALLATION

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701VT DISPLAY / 11LIST SELECTIONA List Selection box displays when more than one entry is pos

Page 6

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070112 / VT DISPLAYVT SETUP/CONFIGURATION MODEVirtual Terminal (VT) setup enables customization

Page 7

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701VT DISPLAY / 13REGIONAL SETTINGS:– Language: English (en) is the only language currently s

Page 8

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070114 / VT DISPLAYDISPLAY/VOLUME SETUP AND SCREEN CALIBRATIONThe Display/Volume Setup and Scre

Page 9 - VT DISPLAY

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701VT DISPLAY / 15SCREEN CALIBRATIONA screen calibration can be performed if the touch screen

Page 10 - OPERATOR’S MANUAL

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070116 / VT DISPLAYNOTE: For Virtual Terminals, other than DICKEY-john, refer to the manufactur

Page 11

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701VT DISPLAY / 17DATE AND TIME SETUPThe Date and Time appears at the bottom left corner of t

Page 12

10" Virtual Terminal11001-1440-200701iiTABLE OF CONTENTSTask Controller ...

Page 13

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070118 / VT DISPLAYADDITIONAL APPLICATIONSThe Additional Applications screen indicates what app

Page 14

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701VT DISPLAY / 19CAN BUS LOGGERCAN Bus Logger is a diagnostics tool used for troubleshooting

Page 15

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070120 / VT DISPLAY

Page 16

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TRACTOR ECU / 21TRACTOR ECUThe Tractor ECU provides a communication interface for exchangi

Page 17

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070122 / TRACTOR ECUTRACTOR ECU SYMBOLSFigure 16Symbol DescriptionAccumulatorArea per hourAudio

Page 18

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TRACTOR ECU / 23TECU SETUPThe Tractor ECU (TECU) Setup screen allows selection of the cont

Page 19

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070124 / TRACTOR ECUI/O SENSOR CONFIGURATIONThe I/O Sensor Configuration screen configures the

Page 20

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TRACTOR ECU / 25GROUND SPEED CALIBRATIONThe Ground Speed Calibration screen determines:• G

Page 21

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070126 / TRACTOR ECU6. The value in yellow is the current calibration value that does not chang

Page 22

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TRACTOR ECU / 27PTO CONFIGURATIONThe PTO Configuration screen determines:• PTO Working Spe

Page 23 - TRACTOR ECU

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070110” VIRTUAL TERMINAL (VT) / 110” VIRTUAL TERMINAL (VT)The Virtual Terminal (VT) is tested a

Page 24

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070128 / TRACTOR ECUTHREE-POINT HITCH CONFIGURATIONThe three-point hitch configuration screen a

Page 25

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TRACTOR ECU / 29HITCH POSITION USING UPPER AND LOWER PARAMETERSHitch status based on a hit

Page 26

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070130 / TRACTOR ECUACCUMULATORSThe Accumulator screen displays accumulative time, distance and

Page 27

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TRACTOR ECU / 31Figure 23Clear Accumulators ScreenLIFETIME ACCUMULATORThe Lifetime Accumul

Page 28

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070132 / TRACTOR ECUALARMSVarious alarm conditions can be presented during Work mode whenever t

Page 29

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TRACTOR ECU / 33FULL SCREEN ALARMSA full-screen alarm will popup and an indicator will app

Page 30

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070134 / TRACTOR ECUSERVICEThe Service screen provides current system status for all inputs and

Page 31

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 35TASK CONTROLLERTask Controller is used to communicate between an offic

Page 32

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070136 / TASK CONTROLLERMAIN OPERATE SCREENThe Task Controller main operate screen identifies:•

Page 33

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 37NOTE: A 2GB or smaller SD card should only be used.Figure 29Data Card

Page 34

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-2007012 / 10” VIRTUAL TERMINAL (VT)

Page 35

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070138 / TASK CONTROLLERSYMBOLSFigure 30IconButtonsDescriptionAssign ProductCancel/RejectCreate

Page 36

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 39VARIABLE RATE OR SINGLE RATE TASK (PC)A task created from a PC, whethe

Page 37 - TASK CONTROLLER

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070140 / TASK CONTROLLERNOTE: The Reset button will clear the bin and product name selected.Fig

Page 38

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 41RUNNING MULTIPLE CHANNELS OF VARIABLE RATEWhen one product is assigned

Page 39 - < 2 GB

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070142 / TASK CONTROLLERFigure 34Bin Chaining Setup screen4. Press the Next button to access th

Page 40 - 38 / TASK CONTROLLER

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 43‘AS APPLIED’ TASK To record rates of the current product being applied

Page 41

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070144 / TASK CONTROLLERFigure 36As Applied Task (Main Screen)CUSTOMIZING AN ‘AS APPLIED’ TASKA

Page 42 - 40 / TASK CONTROLLER

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 45Figure 37Add Customer ScreenADD FARM1. To enter a new farm, press the

Page 43

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070146 / TASK CONTROLLERADD FIELD1. Press the New Data icon located next to the Field selection

Page 44 - 42 / TASK CONTROLLER

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 47VT GENERATED TASK To run a VT-generated, single-rate task, the product

Page 45 - ‘AS APPLIED’ TASK

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701VT INSTALLATION / 3VT INSTALLATIONThe VT is secured in the tractor cab by a VT bracket tha

Page 46 - ADD CUSTOMER

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070148 / TASK CONTROLLERNOTE: Product data is stored on the SD card. Data will need to be re-en

Page 47 - ADD FARM

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 4910. Enter the desired application rate of the product by pressing the

Page 48

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070150 / TASK CONTROLLERTo re-assign a product to a task:1. Return to the Task Controller Main

Page 49

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 51IMPORTANT: Selecting Full Rate from each bin is NOT RECOMMENDED for VR

Page 50 - 48 / TASK CONTROLLER

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070152 / TASK CONTROLLER

Page 51 - TASK CONTROLLER / 49

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 53RUNNING A TASKA Confirm Task Setup screen will display with the select

Page 52

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070154 / TASK CONTROLLERTo change the rate, create a VT generated task within Task Controller (

Page 53 - NO DEVICES FOUND

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 55MAP CONTROLSTo navigate within the map, the appropriate navigation but

Page 54

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070156 / TASK CONTROLLERIMPORTANT: Task Controller accumulation values may be one update behind

Page 55 - Select Operator

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 57IMPORTANT: When saving a task, do not power the terminal off. Wait unt

Page 56 - MAP NAVIGATION

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-2007014 / VT INSTALLATIONCAB HARNESS CONNECTIONSThe following diagram illustrates cab harness lay

Page 57

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070158 / TASK CONTROLLERVIEW INTELLIAG DATA WHILE RUNNING A TASKWhile a task is running, a user

Page 58

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 59MAINTENANCE (EDIT/DELETE)The Task Controller Maintenance screen is a c

Page 59

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070160 / TASK CONTROLLERMARKERSMarkers are used to record the GPS location of a particular cond

Page 60

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 61MARKER SCOPEThe Marker Scope is a required field when a Marker Name is

Page 61

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070162 / TASK CONTROLLERFigure 57Assigned Markers MARKER OPERATIONStarting, stopping, and drop

Page 62

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TASK CONTROLLER / 63Figure 58Marker Operation ScreenOTHER MARKER VIEWS Markers can also be

Page 63

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070164 / TASK CONTROLLER

Page 64

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701GLOBAL POSITIONING SYSTEM (GPS) /GLOBAL POSITIONING SYSTEM (GPS)Before a task is started,

Page 65 - OTHER MARKER VIEWS

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070166 / GLOBAL POSITIONING SYSTEM 5. Press the GPS Setup button to display the GPS Setup scree

Page 66

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701GLOBAL POSITIONING SYSTEM (GPS) /ANTENNA LOCATIONThe GPS antenna’s mounting location must

Page 67

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701VT INSTALLATION / 5NOTE: The ignition lead must be connected to a switched +12VDC for the

Page 68

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070168 / GLOBAL POSITIONING SYSTEM

Page 69

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701TROUBLESHOOTING / 69TROUBLESHOOTINGIssue Probable Cause ResolutionNo positioning available

Page 70

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-20070170 / TROUBLESHOOTING

Page 71 - TROUBLESHOOTING

Copyright 2008 DICKEY-john Corporation Specifications subject to change without notice. Dealers have the responsibility of calling to the atte

Page 72

OPERATOR’S MANUAL10" Virtual Terminal11001-1440-2007016 / VT INSTALLATION

Page 73 - DICKEY-john® WARRANTY

OPERATOR’S MANUAL 10" Virtual Terminal11001-1440-200701VT DISPLAY / 7VT DISPLAYPOWERThe VT does not have an ON/OFF power button. It is connected

Commentaires sur ces manuels

Pas de commentaire