Great-plains Inner Pivot Shear Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Matériel Great-plains Inner Pivot Shear. Great Plains Inner Pivot Shear User Manual [en] Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 3
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
© Copyright 20004 Printed
Great Plains Mfg., Inc.
Used with:
Installation Instructions
506-254M
Front Fold Boom Sprayer
Inner Pivot Shear Update
TSF 1080
TSF 1090
TSF 1280
TSF 1290
General Information
When you see this symbol, the subsequent instructions and
warnings are serious - follow without exception. Your life and
the lives of others depend on it!
!
!
These instructions explain how to install the Inner
Pivot Shear Kit.
These instructions apply to:
506-264A Inner Pivot Shear Kit TSF90
Manual Update
Refer to the Front Fold Boom Sprayer operator’s
manual for detailed information on safely operat-
ing, adjusting, troubleshooting and maintaining
the Inner Pivot Shear Kit. Refer to the parts man-
ual for part identification.
500-641M Operator’s Manual
500-641P Parts Manual
9/21/2004
Before You Start
Page 3 is a detailed listing of parts included in the
Inner Pivot Shear Update package. Use this list to
inventory parts received.
Tools Required
Basic hand tools
Definitions
Right-hand and left-hand as used in this manual
are determined by facing the direction the ma-
chine will travel while in use unless otherwise
stated.
Assembly Instructions
Refer to the drawing on the next page.
1. Unfold and support the inner booms. They will
need to be disconnected completely. Remove the
tilt cylinder pin from the top of the pivot tube and
the tilt pivot pin (39) from the bottom of the pivot
tube.
2. Unbolt the upper pivot pin (4) at the top of the piv-
ot tube, remove the shims (3), and lift out. Re-
move the pin (16) from the inner fold cylinder (17)
and swivel the cylinder away from the pivot post.
3. Lift up on the pivot post (11) and remove it. Leave
the lower pivot pin in place.
4. Take the replacement pivot tube shear bolt as-
sembly and place it on the lower pivot pin (10).
Replace the upper pivot pin (4), shims (3) and
thrust washer (6). Make sure the pivot tube is
free to rotate.
5. Reconnect the inner fold cylinder to the pivot
tube shear plate. Position the inner boom on the
pivot tube and replace the tilt pivot pin (39). Re-
connect the tilt cylinder to the lug at the top of the
pivot post.
6. Make sure all bolts are in Place and tightened.
Vue de la page 0
1 2 3

Résumé du contenu

Page 1 - Assembly Instructions

© Copyright 20004 PrintedGreat Plains Mfg., Inc.Used with:Installation Instructions506-254MFront Fold Boom SprayerInner Pivot Shear Update• TSF 1080•

Page 2 - Inner Pivot Shear Update

506-254M 9/21/2004Great Plains Mfg., Inc.Inner Pivot Shear Update221805

Page 3 - Great Plains Mfg., Inc

506-254M9/21/2004Great Plains Mfg., Inc.3Installation Instructions506-264A Inner Pivot Shear Kit TSF90Your kit includes:1 506-254S INNER PIVOT TUB

Commentaires sur ces manuels

Pas de commentaire