Great Plains Mfg., Inc.Installation Instructions 1©Copyright 2007 Printed 03/12/2007 148-772MV300 Pivot Lock UpgradeV300 and V300F Verti-DrillsUsed wi
Great Plains Mfg., Inc.2 V300 Pivot Lock Upgrade148-772M 03/12/2007Site PreparationRefer to Figure 21. Clear obstructions and hazards at the work site
Great Plains Mfg., Inc.Installation Instructions 303/12/2007 148-772MRemove Old Pivot LockRefer to Figure 39. Remove any pin: PIN WIRE SNAP LOCK 1/2 X
Great Plains Mfg., Inc.4 V300 Pivot Lock Upgrade148-772M 03/12/2007Weld Ear Mount ExtensionsRefer to Figure 5Note: The channel between the ears/extens
Great Plains Mfg., Inc.Installation Instructions 503/12/2007 148-772MWeld Face Plate ExtensionsRefer to Figure 725. Select two new: 248-511D PIVOT STO
Great Plains Mfg., Inc.6 V300 Pivot Lock Upgrade148-772M 03/12/2007Weld Pivot Stop BracesRefer to Figure 932. Make a 1cm (3⁄8in) fillet weld along the
Great Plains Mfg., Inc.Installation Instructions 703/12/2007 148-772MReinstalled Cleared Components42. Reconnect any hydraulic hoses disconnected atst
Great Plains Mfg., Inc.8 V300 Pivot Lock Upgrade148-772M 03/12/2007Great Plains Manufacturing, Inc.Corporate Office: PO Box 5060Salina, KS 67402-5060 U
Commentaires sur ces manuels